Las Vegans for Better Transit Join →

Las Vegans for Better Transit

Las Vegas is the largest metro in America without light rail.

And our buses are about to be cut in half. We are organizing the people who can stop that — and build the Valley the next generation of Las Vegans deserves.


§ 01 / The reality

The Valley moves on a bus system most Las Vegans have never thought twice about.

2.3M Residents in the Valley
57.9M Annual RTC bus trips

The 14th-busiest bus system in the United States.

0 mi Light rail in the entire metro

§ 02 / The cliff

Without action in the 2027 Nevada legislative session, 42% of bus service is gone in 2028.

"Without a new dedicated funding source, the Regional Transportation Commission of Southern Nevada will be forced to eliminate fifteen routes and reduce service across the network — affecting hundreds of thousands of riders by 2028." — RTC of Southern Nevada, March 2026

The Nevada Legislature meets every two years. The 2027 session is the only window before the cuts hit. After that, recovery starts from a smaller, weaker baseline.

Read why now →

§ 03 / There is still hope

Real projects are already in motion. They need a public that's organized to defend them.

Fall 2026

Maryland Parkway BRT

$378 million, 29 stations, hydrogen fuel cell buses, dedicated lanes from downtown to Henderson.

Underway

Charleston corridor

A 17-mile light-rail-vs.-BRT study covering 12,000+ daily transit trips. The Valley's first potential rail line.

Expected 2029

Brightline West

High-speed rail to Southern California — and a new last-mile imperative for transit at our end.


§ 04 / What we do

We educate, we organize, and we advocate.

Educate

We help Las Vegans see the connection between how we get around, what our neighborhoods look like, and what daily life in the Valley costs.

Our vision →

Organize

We turn diffuse public support for transit into a constituency legislators have to answer to.

Our projects →

Advocate

We show up at the Legislature, the RTC board, and city councils across the Valley.

Our strategy →

The 2027 session is the moment

We need you in the room.

Get involved →

Newsletter

Updates from the front lines.

The 2027 session is the moment. Subscribe for legislative updates, project briefs, and ways to show up.

(Form is a placeholder — Beehiiv embed URL will be wired in src/lib/site.ts before launch.)